logo

Warri Oil Refinery Rehabilitation

Sector: Manufacturing (Industrial) • Location: Warri, Delta, Nigeria

Source: African Energy

Project
Completed

The Warri oil refinery in Delta State, Nigeria, has resumed operations after a 26-month rehabilitation project carried out by Daewoo Engineering & Contracting. The refinery has a processing capacity of 125,000 barrels per day.

Status
Closed
Sector
Manufacturing (Industrial), Oil and Gas
Location
Warri, Delta, Nigeria
Updated
22 Jul 2026
Source
African Energy

ConstructChat

Ask ConstructChat about Warri Oil Refinery Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Warri Oil Refinery Rehabilitation” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Warri, Delta, Nigeria. Taiyo aggregates data on it from African Energy.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Warri oil refinery in Delta State, Nigeria, has resumed operations after a 26-month rehabilitation project carried out by Daewoo Engineering & Contracting. The refinery has a processing capacity of 125,000 barrels per day.

Original sector

Resources

Location

Country

Nigeria

State

Delta

City

Warri

Source

Source

African Energy

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Oil and Gas

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project