Warrior's Path Phase 2 Improvements
Pre-design · Texas · Last reported Mar 2024
Source: Dodge USA
LImits from FM 2410 (E Knights Rd) - Limits to Pontotoc Trace - Widen from an existing 22- foot-wide roadway to a 40-foot-wide roadway - The road will remain two lanes, but a continuous center turn lane will be added - Additional improvements include a curb and gutter stormwater management system and an eight-foot-wide sidewalk on the west side - The length of the project is approximately 0.42 mil
- Status
- Prospective
- Sector
- Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Harker Heights, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Warrior's Path Phase 2 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | LImits from FM 2410 (E Knights Rd) - Limits to Pontotoc Trace - Widen from an existing 22- foot-wide roadway to a 40-foot-wide roadway - The road will remain two lanes, but a continuous center turn lane will be added - Additional improvements include a curb and gutter stormwater management system and an eight-foot-wide sidewalk on the west side - The length of the project is approximately 0.42 mile |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Harker Heights |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
