logo

Warsaw-Łódź High-Speed Rail 'Y' Line

Sector: Government • Location: Poland

Source: RaillyNews

Project
Planned

The 'Y' line is a high-speed rail project spanning 14.3 kilometers between Warsaw and Łódź in Poland. It aims to connect key economic hubs with trains operating at speeds up to 350 km/h, incorporating advanced track geometry, energy-efficient 25 kV AC power system, and environmental measures such as vibration and noise reduction and wildlife corridors. The project uses a design-and-build procureme

Status
Prospective
Sector
Government, Mass Transit, Rail, Power Generation (CCGT)
Location
Poland
Updated
22 Jul 2026
Source
RaillyNews

ConstructChat

Ask ConstructChat about Warsaw-Łódź High-Speed Rail 'Y' Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Warsaw-Łódź High-Speed Rail 'Y' Line” is an infrastructure initiative in the Government sector, located in Poland. Taiyo aggregates data on it from RaillyNews.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 'Y' line is a high-speed rail project spanning 14.3 kilometers between Warsaw and Łódź in Poland. It aims to connect key economic hubs with trains operating at speeds up to 350 km/h, incorporating advanced track geometry, energy-efficient 25 kV AC power system, and environmental measures such as vibration and noise reduction and wildlife corridors. The project uses a design-and-build procurement method and includes 55 infrastructure components like viaducts, bridges, and pedestrian overpasses. It is expected to be operational by 2032 and fully completed by 2035, enhancing regional integration, economic growth, and environmental sustainability.

Original sector

Transportation

Location

Country

Poland

Source

Source

RaillyNews

URL

More Details

Record type

Project

Sector

Government, Mass Transit, Rail, Power Generation (CCGT)

Article published date

2026-04-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project