logo
ProjectApproved

WARSAW INTEGRATED SOLID WASTE MANAGEMENT

Sector: Biomass • Location: Poland

Source: European Investment Bank (EIB)

Construction and operation of a large-scale incinerator (2 units, total nominal capacity of 265,200 t/year), co-generating electricity and heat, and a material recovery facility (MRF) (30,000 t/year), located at a brownfield site in the western suburbs of Warsaw

Status
Prospective
Sector
Biomass, Waste Processing and Treatment, Power Generation (CCGT)
Location
Poland
Updated
19 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about WARSAW INTEGRATED SOLID WASTE MANAGEMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WARSAW INTEGRATED SOLID WASTE MANAGEMENT” is an infrastructure initiative in the Biomass sector, located in Poland. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Construction and operation of a large-scale incinerator (2 units, total nominal capacity of 265,200 t/year), co-generating electricity and heat, and a material recovery facility (MRF) (30,000 t/year), located at a brownfield site in the western suburbs of Warsaw

Original sector

Solid waste

Location

Country

Poland

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Biomass, Waste Processing and Treatment, Power Generation (CCGT)

Article published date

2026-11-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project