WARSAW INTEGRATED SOLID WASTE MANAGEMENT
Sector: Biomass • Location: Poland
Source: European Investment Bank (EIB)
Construction and operation of a large-scale incinerator (2 units, total nominal capacity of 265,200 t/year), co-generating electricity and heat, and a material recovery facility (MRF) (30,000 t/year), located at a brownfield site in the western suburbs of Warsaw
- Status
- Prospective
- Sector
- Biomass, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- Poland
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about WARSAW INTEGRATED SOLID WASTE MANAGEMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction and operation of a large-scale incinerator (2 units, total nominal capacity of 265,200 t/year), co-generating electricity and heat, and a material recovery facility (MRF) (30,000 t/year), located at a brownfield site in the western suburbs of Warsaw |
Original sector | Solid waste |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Biomass, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
