logo
ProjectClosed

WAS Thickening: DAFT Pre-Purchase Package

Sector: Bridge • Location: Caldwell, Idaho, United States of America

Source: Dodge

Wastewater Treatment Plant WWTP . DAFT system will consist of one (1) dissolved air flotation thickening (DAFT) system for the City of Caldwell s Wastewater Treatment Plant (WWTP). The DAFT system will include the 20-foot diameter tank, tank bridge, skimmer mechanism, recycle pump, and other support components for a fully functioning DAFT system. The system will operate in parallel with an existin

Status
Closed
Sector
Bridge, Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
Location
Caldwell, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WAS Thickening: DAFT Pre-Purchase Package

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WAS Thickening: DAFT Pre-Purchase Package” is an infrastructure initiative in the Bridge sector, located in Caldwell, Idaho, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Wastewater Treatment Plant WWTP . DAFT system will consist of one (1) dissolved air flotation thickening (DAFT) system for the City of Caldwell s Wastewater Treatment Plant (WWTP). The DAFT system will include the 20-foot diameter tank, tank bridge, skimmer mechanism, recycle pump, and other support components for a fully functioning DAFT system. The system will operate in parallel with an existing 20-foot DAFT unit and shall operate at influent waste active sludge flows up to 170 gallons per...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Caldwell

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Waste Processing and Treatment, Water Supply and Storage, Commercial, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project