Wascana Lake Irrigation Project - Phase 2 Wascana Park
Sector: Water Supply and Storage • Location: Regina, Saskatchewan, Canada
Source: Dodge USA
The work consists of replacing the existing underground irrigation system in Wascana Park. It includes the installation of 5600m of HDPE DR11 Main Line ranging from 100mm to 300mm in diameter. The project also includes 1400 underground sprinkler heads complete with lateral piping.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Car parking, Automotive, Commercial, Raw Materials
- Location
- Regina, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wascana Lake Irrigation Project - Phase 2 Wascana Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of replacing the existing underground irrigation system in Wascana Park. It includes the installation of 5600m of HDPE DR11 Main Line ranging from 100mm to 300mm in diameter. The project also includes 1400 underground sprinkler heads complete with lateral piping. |
Procurement method |
Location
Country | Canada |
State | Saskatchewan |
City | Regina |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Commercial, Raw Materials |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
