Washburn Rural Middle School Winter 2024/Summer 2025
One of 10,000+ projects Taiyo tracks in Kansas.
Source: Dodge USA
Bid Package Includes: Selective Demolition, Masonry, Steel, Carpentry, Architectural Cabinets and Millwork, Doors, Frames, Hardware, Aluminum Entrances and Storefront, Skylights, Metal Stud with Drywall, ACT, Resilient Flooring, Resinous Flooring, Painting, Visual Display Boards, Signage, Specialties, Window Treatments, Fire Sprinkler, Plumbing, HVAC, Electrical with Fire Alarm and Communications
- Status
- Closed
- Sector
- Metal, Cement, Education, Power Generation (CCGT), Steel, Government, Commercial
- Location
- Topeka, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Washburn Rural Middle School Winter 2024/Summer 2025
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bid Package Includes: Selective Demolition, Masonry, Steel, Carpentry, Architectural Cabinets and Millwork, Doors, Frames, Hardware, Aluminum Entrances and Storefront, Skylights, Metal Stud with Drywall, ACT, Resilient Flooring, Resinous Flooring, Painting, Visual Display Boards, Signage, Specialties, Window Treatments, Fire Sprinkler, Plumbing, HVAC, Electrical with Fire Alarm and Communications - The renovation scope for the Summer of 2025 is focused on updating the library. The space will ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Topeka |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Education, Power Generation (CCGT), Steel, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
