Washington and Lee University Campus Utility Infrastructure Project Phase 1b
The owner, status and timeline of this project. A free account opens every field.
Source: Washington and Lee University
Phase 1b of the campus utility infrastructure project at Washington and Lee University involves extending the low-temperature hot water (LTHW) piping network through central areas of front campus in three connected segments. This phase will connect key buildings and tie into the heat recovery chiller at the new Williams School building, supporting the university's sustainability goals and Campus M
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT), Education, Commercial
- Location
- Lexington, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Washington and Lee University
ConstructChat
Ask ConstructChat about Washington and Lee University Campus Utility Infrastructure Project Phase 1b
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1b of the campus utility infrastructure project at Washington and Lee University involves extending the low-temperature hot water (LTHW) piping network through central areas of front campus in three connected segments. This phase will connect key buildings and tie into the heat recovery chiller at the new Williams School building, supporting the university's sustainability goals and Campus Master Plan. |
Original sector | Built Environment |
Location
Country | United States of America (USA) |
State | Virginia |
City | Lexington |
Source
Source | Washington and Lee University |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT), Education, Commercial |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Shaw Air Force Base
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
- Texas LNG’s New Liquefied Natural Gas Facility, Brownsville, Texas
- Trunkline LNG Lake Charles Terminal, Louisiana
