logo
ProjectAwarded

Washington Avenue Bridge Replacement Project

Sector: Power Transmission • Location: Wheeling, West Virginia, United States

Source: The Intelligencer

The Washington Avenue Bridge in Wheeling is set for a complete replacement. The project involves closing the bridge to all traffic for one year starting in October 2025. The new bridge will be a concrete structure replacing the existing floating cantilever bridge, which has maintenance issues and a reduced load limit. The project includes utility work and environmental considerations related to lo

Status
Closed
Sector
Power Transmission, Bridge, Power Generation (CCGT), Cement, Government
Location
Wheeling, West Virginia, United States of America
Updated
22 Jul 2026
Source
The Intelligencer

ConstructChat

Ask ConstructChat about Washington Avenue Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Washington Avenue Bridge Replacement Project” is an infrastructure initiative in the Power Transmission sector, located in Wheeling, West Virginia, United States. Taiyo aggregates data on it from The Intelligencer.

Participants

Sponsoring Agency

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Washington Avenue Bridge in Wheeling is set for a complete replacement. The project involves closing the bridge to all traffic for one year starting in October 2025. The new bridge will be a concrete structure replacing the existing floating cantilever bridge, which has maintenance issues and a reduced load limit. The project includes utility work and environmental considerations related to local habitats.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

West Virginia

City

Wheeling

Source

Source

The Intelligencer

URL

More Details

Record type

Project

Sector

Power Transmission, Bridge, Power Generation (CCGT), Cement, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project