Washington Bridge Westbound Span Replacement
Sector: Automotive • Location: Providence, Rhode Island, United States
Source: Engineering News-Record
Walsh Construction Co. and design partner WSP have been selected to build a new westbound span for the I-195 Washington Bridge in Providence, Rhode Island. The project involves replacing the bridge after the original westbound span was closed due to advanced structural deterioration and subsequently demolished. The new bridge will have a shorter length, fewer in-water piers, a capacity of 80,000 v
- Status
- Closed
- Sector
- Automotive, Water Supply and Storage, Bridge, Government
- Location
- Providence, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Engineering News-Record
ConstructChat
Ask ConstructChat about Washington Bridge Westbound Span Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Walsh Construction Co. and design partner WSP have been selected to build a new westbound span for the I-195 Washington Bridge in Providence, Rhode Island. The project involves replacing the bridge after the original westbound span was closed due to advanced structural deterioration and subsequently demolished. The new bridge will have a shorter length, fewer in-water piers, a capacity of 80,000 vehicles per day, and a 100-year design life with features to facilitate inspection and maintenance. The project also includes congestion upgrades along the I-195 corridor and aesthetic elements to mimic the original bridge. |
Original sector | Transportation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Providence |
Source
Source | Engineering News-Record |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Bridge, Government |
Article published date | 2025-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
