logo

Washington Street @ Saddleback

Sector: Consumer Products • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: 800’ north and south of centerline Saddleback Rd and 200’ west of centerline Washington St Length: 1,800 ft District: 1 Community: Woodcrest

The Riverside County Transportation Department proposes to install a traffic signal at the intersection of Washington St and Saddleback Rd in the Woodcrest area of Riverside County. Washington St is a 2-lane arterial that travels in the North-So

Project Information FAQ

Project Information

4 Q
The project “Washington Street @ Saddleback” is an infrastructure initiative in the Consumer Products sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: 800’ north and south of centerline Saddleback Rd and 200’ west of centerline Washington St Length: 1,800 ft District: 1 Community: Woodcrest The Riverside County Transportation Department proposes to install a traffic signal at the intersection of Washington St and Saddleback Rd in the Woodcrest area of Riverside County. Washington St is a 2-lane arterial that travels in the North-South directions. Existing pavement width is approximately 34’ wide with 12’ through lanes and 5’ paved shoulders. There is asphalt dike on both sides of Washington St. Saddleback Rd is a 2-lane local road that travels in the East-West directions. Existing pavement width is approximately 36’ wide with 18’ through lanes and curb and gutter on both sides. The area in the immediate vicinity is low-density residential housing. The project scope includes: Widening pavement Grading Constructing retaining wall Reconstructing driveways Reconstructing overside drains Constructing overside drain pipe Installing asphalt dike Constructing Curb ramps Utility relocations and adjustments Relocating fences Removing vegetation Signing/striping modifications Installing traffic signal poles, signal mast arms, cabinets, conduits, pullboxes, and other traffic signal equipment Emergency Storm Drain Repairs Project Overview Washington St at Saddleback Road Emergency Storm Drain Repairs The construction of the proposed traffic signal at Washington Street and Saddleback Road was temporarily suspended due to the discovery of a large void under the roadway caused by a damaged storm drain system. Emergency project scope includes: Clearing and grubbing Excavation Shoring Backfill (slurry and base) Removal and replacement of pipe Slope stabilization Rock slope protection Asphalt paving

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data