Washington Street Sidewalks Project
Sector: Road • Location: Duxbury, Massachusetts, United States
Source: Duxbury Clipper
The project involves constructing over 2,260 linear feet of five-foot wide, ADA-compliant asphalt sidewalks with sloped granite curbing along Washington Street in Duxbury. The construction will cover two sections: Surplus Street to 430 Washington Street and Fort Hill Lane to the Bluefish River Bridge, connecting existing sidewalks. The project aims to improve pedestrian access and walkability in t
- Status
- Prospective
- Sector
- Road, Bridge, Government
- Location
- Duxbury, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Duxbury Clipper
ConstructChat
Ask ConstructChat about Washington Street Sidewalks Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves constructing over 2,260 linear feet of five-foot wide, ADA-compliant asphalt sidewalks with sloped granite curbing along Washington Street in Duxbury. The construction will cover two sections: Surplus Street to 430 Washington Street and Fort Hill Lane to the Bluefish River Bridge, connecting existing sidewalks. The project aims to improve pedestrian access and walkability in the town. |
Original sector | Built Environment |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Duxbury |
Source
Source | Duxbury Clipper |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
