Washington Township Barto Road Realignment
Sector: Government • Location: Barto, Pennsylvania, United States of America
Source: Dodge
The project consists of 1300 feet of roadway realignment. The new roadway will consist of 1.5 of 9.5mm wearing course on 2 of 19mm binder course on 4 of 25mm base course on 6 of 2A subbase. Additional work includes; large amounts of heavy grading, installation of S75 erosion matting, existing signage removal and new signage installation, tree plantings installation of a segmental block retaining w
- Status
- Closed
- Sector
- Government, Mass Transit, Rail, Road, Manufacturing (Industrial), Commercial
- Location
- Barto, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Washington Township Barto Road Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of 1300 feet of roadway realignment. The new roadway will consist of 1.5 of 9.5mm wearing course on 2 of 19mm binder course on 4 of 25mm base course on 6 of 2A subbase. Additional work includes; large amounts of heavy grading, installation of S75 erosion matting, existing signage removal and new signage installation, tree plantings installation of a segmental block retaining wall and guiderail as indicated on the construction drawings. The existing roadway material will b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Barto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Mass Transit, Rail, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
