Waste heat recovery from Quebec City’s incinerator with a steam distribution network
Sector: Hospital • Location: Quebec, Canada
Source: Infrastructure Canada
Construction of a trigeneration system offering a high-pressure steam system produced by the Quebec City incinerator and transported via a network of underground pipes to the New Hospital Complex to generate electricity, steam, heating and cooling of its facilities.
- Status
- Prospective
- Sector
- Hospital, Power Generation (CCGT)
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Waste heat recovery from Quebec City’s incinerator with a steam distribution network
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a trigeneration system offering a high-pressure steam system produced by the Quebec City incinerator and transported via a network of underground pipes to the New Hospital Complex to generate electricity, steam, heating and cooling of its facilities. |
Original sector | Green Energy |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hospital, Power Generation (CCGT) |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
