logo

Waste Isolation Pilot Plant , New Mexico, USA

Sector: Aerospace & Defense • Location: United States of America

Source: Bechtel

Project
Close

Waste Isolation Pilot Plant ,Delivering permanent, safe disposal for defense-generated nuclear waste

The U.S. Department of Energy selected a Bechtel company to manage the nation’s only deep underground repository for nuclear waste: the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The site has been operating since 1999, receiving shipments from 22 sites across the country.  DOE ove

Project Information FAQ

Project Information

4 Q
The project “Waste Isolation Pilot Plant , New Mexico, USA” is an infrastructure initiative in the Aerospace & Defense sector, located in United States of America. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Waste Isolation Pilot Plant ,Delivering permanent, safe disposal for defense-generated nuclear waste The U.S. Department of Energy selected a Bechtel company to manage the nation’s only deep underground repository for nuclear waste: the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The site has been operating since 1999, receiving shipments from 22 sites across the country.  DOE oversees WIPP, which is the nation’s only deep geologic repository for transuranic waste, or TRU waste. This defense-generated TUR waste consists of items contaminated with plutonium and other man-made radioactive isotopes. WIPP receives regular shipments from the generator sites and is responsible for emplacing the shipments in the repository.  The repository is 2,100 feet below the surface and consists of underground tunnels and storage rooms. Sited in a bedded salt formation, the waste emplaced in disposal rooms at WIPP will be encapsulated in salt through natural geologic processes, safely isolating the waste for thousands of years.  Aerial view of the Waste Isolation Pilot Plant as a shipment arrives. (Department of Energy photo) Combining mining and government experience  In 2022, the Department of Energy selected a Bechtel company, Salado Isolation Mining Contractors or SIMCO, to conduct the Maintenance and Operations at the Waste Isolation Pilot Plant.  Bechtel has extensive expertise in the mining industry. SIMCO’s team brings world class leadership experience in mine construction, safety, and maintenance. The team brings cutting-edge design and operations knowledge, as well as methods and tools to improve safety, schedule, and cost.   SIMCO’s mining experience is complemented by Bechtel’s 45 years’ experience managing Department of Energy nuclear sites in Washington state, Idaho, Nevada, New Mexico, Texas, Kentucky, Tennessee, and South Carolina. Key leaders at SIMCO have previous experience at many of the generator sites of TRU waste. In the 1980’s Bechtel designed, engineered, and constructed the Waste Isolation Pilot Plant on behalf of the U.S. Department of Energy. The contract was delivered on time and saved the Department of Energy $120 million, or 20% of the entire project cost.  Workers place waste for final disposal. (Department of Energy photo) Ensuring the safe management of WIPP  The Department of Energy has a goal to increase shipments to WIPP. Bechtel’s team is their partner in achieving this goal through management of WIPP operations and capital improvement projects.  The focus of WIPP operations is safely managing the disposal, packaging, and transportation of shipments of TRU waste to WIPP. This includes responsible oversight of the Central Characterization Program and related experiment and testing activities.  Capital improvment projects at WIPP include:  Improving mine shaft ventilation Completion of the utility shaft upgrades Mining out new disposal panels  Work continues on the utility shaft. (Department of Energy photo) Project Filters

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data