Waste Pollution Control Facility Upgrades - Phase 1 - LRAR
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Construction of a Low Rate Anaerobic Reactor (LRAR) and associated piping and appurtenances which would be dedicated to the first phase of wastewater treatment at the Portage la Prairie waste pollution control facility. The new LRAR will replace the existing unit, which can continue to be operated until the new LRAR is commissioned.
- Status
- Closed
- Sector
- Water Supply and Storage, Nuclear, Government
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Waste Pollution Control Facility Upgrades - Phase 1 - LRAR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a Low Rate Anaerobic Reactor (LRAR) and associated piping and appurtenances which would be dedicated to the first phase of wastewater treatment at the Portage la Prairie waste pollution control facility. The new LRAR will replace the existing unit, which can continue to be operated until the new LRAR is commissioned. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Manitoba |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Nuclear, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
