logo

Waste treatment plant PPP project in Olemps

Sector: Water Supply and Storage • Location: France

Source: InfraPPPWorld

Project
Closed

This project includes financing, design, land search, execution, operation, maintenance, recovery, and treatment solution of the waste treatment plant for household waste in Olemps, town located in southern France. The capacity of the plant to be developed is 75,200 metric tonne.The scope of work also includes: receive and process on the equipment all waste accepted by the installation, operate th

Project Information FAQ

Project Information

5 Q
The project “Waste treatment plant PPP project in Olemps” is an infrastructure initiative in the Water Supply and Storage sector, located in France. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project includes financing, design, land search, execution, operation, maintenance, recovery, and treatment solution of the waste treatment plant for household waste in Olemps, town located in southern France. The capacity of the plant to be developed is 75,200 metric tonne.The scope of work also includes: receive and process on the equipment all waste accepted by the installation, operate the equipment in accordance with the stipulations, transport, valorize and eliminate the various by-products from equipment including ultimate waste, create an educational tour circuit, support all the operating expenses necessary for the operation of the equipment and ensure the marketing of the energy recovery and the by-products of the installation, recruit and manage all the staff necessary for the proper performance of the tasks etc.Duration of the concession is 25 years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data