Waste Water Treatment Plant Upgrade
Sector: Power Transmission • Location: Oglethorpe, Georgia, United States of America
Source: Dodge USA
The Work to be done consists of furnishing all materials and equipment and performing all labor necessary for the Construction of the Waste Water Treatment Plant Upgrade including site work, demolition, earth moving, finish grading, bar screen, pumping station, flow control structures, utilities, drainage, electrical, piping, concrete slab, foundation, and fencing.
- Status
- Under Construction
- Sector
- Power Transmission, Water Supply and Storage, Cement, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial
- Location
- Oglethorpe, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Waste Water Treatment Plant Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be done consists of furnishing all materials and equipment and performing all labor necessary for the Construction of the Waste Water Treatment Plant Upgrade including site work, demolition, earth moving, finish grading, bar screen, pumping station, flow control structures, utilities, drainage, electrical, piping, concrete slab, foundation, and fencing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Oglethorpe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Cement, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
