Waste Water Treatment Plant Upgrades - Champlain Industrial Park
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
The existing waste water treatment process at the Champlain Industrial Park is not meeting environmental approvals to operate. Electrical systems have surpassed their life expectancy due to high moisture environments and obsolete components. Existing system consists of 2 open air concrete cells. Cell #1 is not operational due to poor condition and cell #2 is the primary source for treatment. The U
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Manufacturing (Industrial)
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Waste Water Treatment Plant Upgrades - Champlain Industrial Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing waste water treatment process at the Champlain Industrial Park is not meeting environmental approvals to operate. Electrical systems have surpassed their life expectancy due to high moisture environments and obsolete components. Existing system consists of 2 open air concrete cells. Cell #1 is not operational due to poor condition and cell #2 is the primary source for treatment. The Ultimate Recipient is not meeting its approval to operate for the outfall of the Waste Water Treatment Plant (WTTP). The Ultimate Recipient is intent on restoring the existing cell #1 (concrete repairs) and adding an EPDM membrane to put this cell back in service. This will provide longer retention times helping the bacterial process. Furthermore, the second cell will become a sedimentation cell reducing the total suspended solids going out into the environment. We are not increasing treatment capacity, the park’s production has been stable for a long time, however the infrastructure is over 50 years old and is in need of refurbishment. All work will take place within the structures of the government-owned facility. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
