Waste Water Treatment Plant Upgrades - Champlain Industrial Park
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
The existing waste water treatment process at the Champlain Industrial Park is not meeting environmental approvals to operate. Electrical systems have surpassed their life expectancy due to high moisture environments and obsolete components. Existing system consists of 2 open air concrete cells. Cell #1 is not operational due to poor condition and cell #2 is the primary source for treatment. The U
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing waste water treatment process at the Champlain Industrial Park is not meeting environmental approvals to operate. Electrical systems have surpassed their life expectancy due to high moisture environments and obsolete components. Existing system consists of 2 open air concrete cells. Cell #1 is not operational due to poor condition and cell #2 is the primary source for treatment. The Ultimate Recipient is not meeting its approval to operate for the outfall of the Waste Water Treatment Plant (WTTP). The Ultimate Recipient is intent on restoring the existing cell #1 (concrete repairs) and adding an EPDM membrane to put this cell back in service. This will provide longer retention times helping the bacterial process. Furthermore, the second cell will become a sedimentation cell reducing the total suspended solids going out into the environment. We are not increasing treatment capacity, the park’s production has been stable for a long time, however the infrastructure is over 50 years old and is in need of refurbishment. All work will take place within the structures of the government-owned facility. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
