Wastewater collection and extension of the water supply system on Île d’Embarras
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Infrastructure Canada
The project involves the construction of an alternative pressurized wastewater collection system and replacement of the drinking water distribution system on Île d’Embarras.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Wastewater collection and extension of the water supply system on Île d’Embarras
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of an alternative pressurized wastewater collection system and replacement of the drinking water distribution system on Île d’Embarras. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
