Wastewater Collection Phase 1 - Contract No. 3
Sector: Water Supply and Storage • Location: South Dennis, Massachusetts, United States of America
Source: Dodge USA
The work of this contract includes, but is not limited to, furnishing and installing approximately 17,500 linear feet of 8-inch to 30-inch polyvinyl chloride (PVC) gravity sewer pipe; 7,500 linear feet of 2-inch to 3-inch SDR-11 high density polyethylene (HDPE) low pressure sewer pipe; 1,600 linear feet of 8-inch HDPE force main; 1 submersible pumping station (PS No. 5); including manholes, sewer
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- South Dennis, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Collection Phase 1 - Contract No. 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this contract includes, but is not limited to, furnishing and installing approximately 17,500 linear feet of 8-inch to 30-inch polyvinyl chloride (PVC) gravity sewer pipe; 7,500 linear feet of 2-inch to 3-inch SDR-11 high density polyethylene (HDPE) low pressure sewer pipe; 1,600 linear feet of 8-inch HDPE force main; 1 submersible pumping station (PS No. 5); including manholes, sewer service connections and appurtenances; earthwork; dewatering and drainage; paving; restoration; a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Dennis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
