logo

Wastewater disposal Southwest IV

Sector: Commercial • Location: Kosovo

Source: KFW Bank aus Verantwortung

Project
Completed

The overarching development policy objectives of the project are the protection of surface and underground water resources, the improvement of the living conditions of the population in Peja (main objectives) and adaptation to climate change (secondary objective). The project objective is to improve the wastewater disposal situation in the urban area of Peja and wastewater treatment. An important

Project Information FAQ

Project Information

5 Q
The project “Wastewater disposal Southwest IV” is an infrastructure initiative in the Commercial sector, located in Kosovo. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The overarching development policy objectives of the project are the protection of surface and underground water resources, the improvement of the living conditions of the population in Peja (main objectives) and adaptation to climate change (secondary objective). The project objective is to improve the wastewater disposal situation in the urban area of Peja and wastewater treatment. An important element of the project concept is an incentive mechanism that links performance improvements by the project sponsor with FC measures. The implementation of the project is therefore dependent on the achievement of the agreed objectives. The investment measures in Peja essentially include the construction of a main collector to the sewage treatment plant site about 7 km away, another collector to connect the southern urban areas to the main collector and a sewage treatment plant for 60,000 population equivalents. To a small extent, measures are also planned in the urban sewage network, which are necessary to lead the wastewater to the sewage treatment plant and to remove rainwater from the sewage system. An accompanying measure is intended to improve the framework conditions in the sector and increase the performance of the project sponsor. The total cost of the project (excluding taxes and other charges) is estimated at EUR 25 million, of which EUR 1.6 million is for the building land and the acquisition of the necessary land use rights, and EUR 1.3 million for the accompanying measure. The costs are to be covered by a FZ grant of EUR 9 million (of which EUR 1 million is for the accompanying measure), funds from SECO (State Secretariat for Economic Affairs of the Swiss Confederation) of EUR 7.6 million, contributions from the municipality of around EUR 4.6 million (partly in the form of land or land use rights), and financial contributions from the EU or the Republic of Kosovo of EUR 3.8 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data