logo

Wastewater Flow Meters Install

Sector: Water Supply and Storage • Location: San Antonio, Texas, United States of America

Source: Dodge USA

Project
Closed

Consulting services to install wastewater flow meters and continuously monitor upstream and downstream of up to twelve (12) Edwards Aquifer sensitive feature or critical flow locations through the term of the contract. The selected consultant (Consultant) will be responsible for providing, installing, maintaining, relocating, and/or removing all flow meters during the contracted period. The purpos

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
San Antonio, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wastewater Flow Meters Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wastewater Flow Meters Install” is an infrastructure initiative in the Water Supply and Storage sector, located in San Antonio, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Consulting services to install wastewater flow meters and continuously monitor upstream and downstream of up to twelve (12) Edwards Aquifer sensitive feature or critical flow locations through the term of the contract. The selected consultant (Consultant) will be responsible for providing, installing, maintaining, relocating, and/or removing all flow meters during the contracted period. The purpose for these consulting services is to alert SAWS to instances of flow loss or other abnormal flow...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project