Wastewater Infrastructure Mitigation
One of 10,000+ projects Taiyo tracks in Iowa.
Source: Dodge USA
- Construction of a 1,800 gpm submersible triplex lift station at Scout Park. 2. Construction of an electrical and controls building, including an emergency generator located in the building, for Scout Park Lift Station. 3. Demolition of existing Scout Park Lift Station, generator, and generator building. 4. Construction of a 200 gpm submersible duplex lift station at Vista Drive, named Ice House
- Status
- Closed
- Sector
- Car parking, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive, Government
- Location
- Storm Lake, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Infrastructure Mitigation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Construction of a 1,800 gpm submersible triplex lift station at Scout Park. 2. Construction of an electrical and controls building, including an emergency generator located in the building, for Scout Park Lift Station. 3. Demolition of existing Scout Park Lift Station, generator, and generator building. 4. Construction of a 200 gpm submersible duplex lift station at Vista Drive, named Ice House. 5. Installation of an emergency generator and control panel at the Ice House Lift Station. 6. D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Storm Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive, Government |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
