Wastewater Lagoon Facility Improvements
Sector: Water Supply and Storage • Location: Smith Center, Kansas, United States of America
Source: Dodge
Work includes furnishing all the labor, materials, and equipment for the wastewater lagoon facility improvements. The improvements include approximately 96,776 cubic yards of common excavation, approximately 92,244 cubic yards of earthwork compaction, 7,355 square yards of crushed concrete slope protection, manhole installation/rehabilitation, 103 linear feet of 12-inch DIP lagoon piping, 493 squa
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment
- Location
- Smith Center, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater Lagoon Facility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes furnishing all the labor, materials, and equipment for the wastewater lagoon facility improvements. The improvements include approximately 96,776 cubic yards of common excavation, approximately 92,244 cubic yards of earthwork compaction, 7,355 square yards of crushed concrete slope protection, manhole installation/rehabilitation, 103 linear feet of 12-inch DIP lagoon piping, 493 square yards of gravel surfacing, 2,175 linear feet of woven wire fencing; trenching; backfilling; ov... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Smith Center |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
