Wastewater Lift Stations & Infrastructure Repair
Sector: Water Supply and Storage • Location: Crestview, Florida, United States of America
Source: Dodge USA
BID ITEM: REPAIR, REPLACEMENT & REHABILITATION OF WASTEWATER LIFT STATIONS & INFRASTRUCTURE SCOPE: Work under this contract covers the replacement of pumps, removal and replacement of discharge piping, replacement/removal of valve pit (or above ground assembly) with above-ground piping/valve assembly, replace MCC panel and all electrical components (excluding SCADA panels) at the station to meet O
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial
- Location
- Crestview, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Lift Stations & Infrastructure Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BID ITEM: REPAIR, REPLACEMENT & REHABILITATION OF WASTEWATER LIFT STATIONS & INFRASTRUCTURE SCOPE: Work under this contract covers the replacement of pumps, removal and replacement of discharge piping, replacement/removal of valve pit (or above ground assembly) with above-ground piping/valve assembly, replace MCC panel and all electrical components (excluding SCADA panels) at the station to meet OCWS Electrical Standards and Specifications. Rehabilitation of Existing wetwells by cementious re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Crestview |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
