Wastewater Mainlines Upgrade
Sector: Water Supply and Storage • Location: Saskatchewan, Canada
Source: Infrastructure Canada
Objective: Improve efficiency and capacity of sewer collection system. Scope: Plan, design and construct appx 330 lineal metres of 50mm force main, 450 lineal metres of 100mm force main, 265 lineal metres of 100mm force main installed by trenchless construction, valves and connections to existing infrastructure, and all associated works. Output: Additional larger diameter sewer line.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Wastewater Mainlines Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Objective: Improve efficiency and capacity of sewer collection system. Scope: Plan, design and construct appx 330 lineal metres of 50mm force main, 450 lineal metres of 100mm force main, 265 lineal metres of 100mm force main installed by trenchless construction, valves and connections to existing infrastructure, and all associated works. Output: Additional larger diameter sewer line. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
