logo
ProjectPre-Design

Wastewater Peak Flow Attenuation Facility

Sector: Government • Location: Barrie, Ontario, Canada

Source: Dodge

Implementation of a peak flow attenuation facility to capture, temporarily store, and reduce peak flows entering the Wastewater Treatment Facility (WwTF). The Wastewater Master Plan recommended to construct a flow attenuation tank at the south side of the WwTF. The new tank, in combination with the existing tanks, that could be available after the MBR treatment technology, would assist in equalizi

Status
Prospective
Sector
Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Residential
Location
Barrie, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wastewater Peak Flow Attenuation Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wastewater Peak Flow Attenuation Facility” is an infrastructure initiative in the Government sector, located in Barrie, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Implementation of a peak flow attenuation facility to capture, temporarily store, and reduce peak flows entering the Wastewater Treatment Facility (WwTF). The Wastewater Master Plan recommended to construct a flow attenuation tank at the south side of the WwTF. The new tank, in combination with the existing tanks, that could be available after the MBR treatment technology, would assist in equalizing the flows for a steady state biological treatment. The flow attenuation tank would also provid...

Budget

Location

Country

Canada

State

Ontario

City

Barrie

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Residential

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project