Wastewater Preliminary Treatment Area Upgrades
Sector: Water Supply and Storage • Location: Flower Mound, Texas, United States
Source: Community Impact
Upgrades to the wastewater preliminary treatment area including installation of two new filter screens, grit classifier replacement, two new grit pumps, grit motors, local control panels, two new flow meters, and electrical improvements. The area removes large objects and small solids before full treatment.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government
- Location
- Flower Mound, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact
ConstructChat
Ask ConstructChat about Wastewater Preliminary Treatment Area Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upgrades to the wastewater preliminary treatment area including installation of two new filter screens, grit classifier replacement, two new grit pumps, grit motors, local control panels, two new flow meters, and electrical improvements. The area removes large objects and small solids before full treatment. |
Original sector | Water and Wastewater |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Flower Mound |
Source
Source | Community Impact |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Union Power Project El Dorado AR
- Queen Elizabeth Way Widening
- Kosciuszko Bridge Replacement Project, New York, US
- Route 141 Improvement, St. Louis, Missouri
- Virginia’s Smart Road
- SR539 Guide Meridian Ten Mile Road Roundabouts, USA
- Frederick Douglass-Susan B Anthony Memorial Bridge (formerly Troup Howell)
- Gilmerton Bridge Replacement Project
