Wastewater System - Phase 2
Sector: Waste Processing and Treatment • Location: Manitoba, Canada
Source: Infrastructure Canada
Phase 2 is a low pressure sewer collection system. Effluent will be collected from individual residences and pumped to a regional interceptor sewer for treatment at the City of Winnipeg North End Pollution Control Centre. The collection system will eliminate all private septic systems in this phase. Many private septic fields are failing, creating an environmental concern.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Wastewater System - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2 is a low pressure sewer collection system. Effluent will be collected from individual residences and pumped to a regional interceptor sewer for treatment at the City of Winnipeg North End Pollution Control Centre. The collection system will eliminate all private septic systems in this phase. Many private septic fields are failing, creating an environmental concern. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Manitoba |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
