Wastewater System Improvement Ph 1
Sector: Chemical (Industrial) • Location: Harrisville, West Virginia, United States of America
Source: Dodge USA
Scope - The Project includes the following Work: Rehabilitation to the existing wastewater treatment plant including removal and replacement of the plant headworks system, clarifier rehabilitation, oxidation ditch improvements, plant lift station rehabilitation, site piping, site work, plant lighting improvements, belt press building roof replacement, miscellaneous electrical upgrades, and all nec
- Status
- Closed
- Sector
- Chemical (Industrial), Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Harrisville, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater System Improvement Ph 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes the following Work: Rehabilitation to the existing wastewater treatment plant including removal and replacement of the plant headworks system, clarifier rehabilitation, oxidation ditch improvements, plant lift station rehabilitation, site piping, site work, plant lighting improvements, belt press building roof replacement, miscellaneous electrical upgrades, and all necessary appurtenances. The project also includes rehabilitation of three (3) existing sanitary sew... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Harrisville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
