Wastewater System Improvements REBID
Sector: Water Supply and Storage • Location: Gilcrest, Colorado, United States of America
Source: Dodge USA
Scope of work : Installation of approximately 3,206 linear feet of 8-inch sewer main, 9,088 linear-feet 8-inch cured in place pipe, 12 removal and replacement of manholes, various manhole repairs and rehabilitation, sanitary sewer point repairs, removal and replacement of asphalt, road base, and site restoration. The project also includes replacement of the 8th street and 12th street sanitary sewe
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Gilcrest, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater System Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : Installation of approximately 3,206 linear feet of 8-inch sewer main, 9,088 linear-feet 8-inch cured in place pipe, 12 removal and replacement of manholes, various manhole repairs and rehabilitation, sanitary sewer point repairs, removal and replacement of asphalt, road base, and site restoration. The project also includes replacement of the 8th street and 12th street sanitary sewer lift stations as well as repairs to the town s existing wastewater treatment plant lagoon liner. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Gilcrest |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
