Wastewater System Improvements
Sector: Water Supply and Storage • Location: Batavia, Ohio, United States of America
Source: Dodge
TRUNK SEWER RELOCATION Work under this Project is generally defined as the relocation of approximately 515 LF of 21 trunk sewer main extending along a tributary to the OBannon Creek northeast of SR 48 and located in Goshen Township, as well as, removing or relocating existing manhole number 5424, between manholes 5404 and 5428, out of the creek bed.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Batavia, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TRUNK SEWER RELOCATION Work under this Project is generally defined as the relocation of approximately 515 LF of 21 trunk sewer main extending along a tributary to the OBannon Creek northeast of SR 48 and located in Goshen Township, as well as, removing or relocating existing manhole number 5424, between manholes 5404 and 5428, out of the creek bed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Batavia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
