Wastewater System Improvements
Sector: Chemical (Industrial) • Location: Brewster, Washington, United States of America
Source: Dodge USA
The Project consists of constructing collection system and WWTP improvements, including rehabilitation of the influent pump station and construction of new gravity and pressure sewer, replacement of fine screening, sludge pumping and UV equipment, a new grit removal system and building, rehabilitation of existing clarifiers, oxidation ditch cold joint repair, electrical improvements, and other anc
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | GC Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of constructing collection system and WWTP improvements, including rehabilitation of the influent pump station and construction of new gravity and pressure sewer, replacement of fine screening, sludge pumping and UV equipment, a new grit removal system and building, rehabilitation of existing clarifiers, oxidation ditch cold joint repair, electrical improvements, and other ancillary system improvements as shown in the Contract Documents. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- William Pond Chemical Toilet Replacement
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- Diet-Induced Changes in Inflammation as Determinants of Colon Cancer (R01)
