logo
ProjectIn Progress

Wastewater System Upgrades - Lamèque

One of 10,000+ projects Taiyo tracks in New Brunswick.

Source: Infrastructure Canada

The Town of Lamèque has a facultative lagoon which was initially constructed in 1975 and updated in 1993 with the reconstruction of the dykes and the addition of a surface aerator. The effluent is discharged along the side of a shallow estuary and high-power aerators are removed from the lagoon during winter as a result of damage occurring in past years. The lagoon serves a population of around 1,

Status
Under Construction
Sector
Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Wastewater System Upgrades - Lamèque

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Wastewater System Upgrades - Lamèque” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Town of Lamèque has a facultative lagoon which was initially constructed in 1975 and updated in 1993 with the reconstruction of the dykes and the addition of a surface aerator. The effluent is discharged along the side of a shallow estuary and high-power aerators are removed from the lagoon during winter as a result of damage occurring in past years. The lagoon serves a population of around 1,285 people. The upgrades to the water treatment system consist in replacing the current treatment system with new components which would allow the system to deliver clean effluent 12 months out of the year and also allow the future development of the municipality. The project consists of: - the construction of a new, deeper lagoon with a synthetic membrane and two basins; - the upgrading of the process by replacing the surface aerators with a system of aeration by fine bubbles; - the replacement of the outfall sewer with a new one which will discharge the effluent through a culvert beneath Highway 113, a location which offers a greater zone of exchange; and - the discharge of effluent during ebb tide to minimize its impact upon the estuary.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project