logo

Wastewater System Upgrades - Lamèque

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

The Town of Lamèque has a facultative lagoon which was initially constructed in 1975 and updated in 1993 with the reconstruction of the dykes and the addition of a surface aerator. The effluent is discharged along the side of a shallow estuary and high-power aerators are removed from the lagoon during winter as a result of damage occurring in past years. The lagoon serves a population of around 1,

Project Information FAQ

Project Information

4 Q
The project “Wastewater System Upgrades - Lamèque” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Town of Lamèque has a facultative lagoon which was initially constructed in 1975 and updated in 1993 with the reconstruction of the dykes and the addition of a surface aerator. The effluent is discharged along the side of a shallow estuary and high-power aerators are removed from the lagoon during winter as a result of damage occurring in past years. The lagoon serves a population of around 1,285 people. The upgrades to the water treatment system consist in replacing the current treatment system with new components which would allow the system to deliver clean effluent 12 months out of the year and also allow the future development of the municipality. The project consists of: - the construction of a new, deeper lagoon with a synthetic membrane and two basins; - the upgrading of the process by replacing the surface aerators with a system of aeration by fine bubbles; - the replacement of the outfall sewer with a new one which will discharge the effluent through a culvert beneath Highway 113, a location which offers a greater zone of exchange; and - the discharge of effluent during ebb tide to minimize its impact upon the estuary.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data