Wastewater System Upgrades Phase 1
Sector: Water Supply and Storage • Location: Denton, Montana, United States of America
Source: Dodge
The project consists of: Bid Schedule I: Rehabilitate and improve the existing three-cell facultative lagoon system. This includes removal of the existing aging lagoon liner, reworking of the embankments, installation of new synthetic lagoon liner, and rehabilitation of pipe/con-trol structures as necessary along with the addition of in-fluent/effluent automated flow monitoring and a UV disinfec t
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Denton, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater System Upgrades Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: Bid Schedule I: Rehabilitate and improve the existing three-cell facultative lagoon system. This includes removal of the existing aging lagoon liner, reworking of the embankments, installation of new synthetic lagoon liner, and rehabilitation of pipe/con-trol structures as necessary along with the addition of in-fluent/effluent automated flow monitoring and a UV disinfec tion system. Bid Schedule II: Replace the North Alley sewer main |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Denton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
