Wastewater Transmission Main & Lift Stations Division A & B
Sector: Water Supply and Storage • Location: Bessemer Township, Michigan, United States of America
Source: Dodge
The Black River Basin Ski Hill in Bessemer Township includes abandonment of communal septic system shared by seven condominium buildings. This project involves constructing 5450 LF of 6" force main, ~4,500 of 8" gravity sewer, air relief structures and one lift station of Bessemer Area Sewer Authority (BASA) Wastewater Treatment Plant (WWTP) to the Black River Basin community and abandoning the cu
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Bessemer Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater Transmission Main & Lift Stations Division A & B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Black River Basin Ski Hill in Bessemer Township includes abandonment of communal septic system shared by seven condominium buildings. This project involves constructing 5450 LF of 6" force main, ~4,500 of 8" gravity sewer, air relief structures and one lift station of Bessemer Area Sewer Authority (BASA) Wastewater Treatment Plant (WWTP) to the Black River Basin community and abandoning the current septic systems (Division A contract). This project is in conjunction with the Section 32 Se... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Bessemer Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
