logo
ProjectStart

Wastewater Treatment Building

One of 10,000+ projects Taiyo tracks in Idaho.

Source: Dodge

Micron Id1 B110 Wwt - Wastewater Treatment Permit #3 - Shell) (C1870170) (Bld23-02886 Foundation) (Bld24-02034 Structural Steel) Permit Is To Construct The Shell, Metal Decks, Concrete Floors, Exiting Systems, Roof System. This Is Phase 1 & 2 For The Wwt Plant With A Phase 3 & 4 Expected. This Building Is Classified As Construction Type I-B. The Building Has A

Status
Prospective
Sector
Water Supply and Storage, Power Transmission, Metal, Waste Processing and Treatment, Cement, Commercial, Steel, Power Generation (CCGT)
Location
Boise, Idaho, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wastewater Treatment Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wastewater Treatment Building” is an infrastructure initiative in the Water Supply and Storage sector, located in Boise, Idaho, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Micron Id1 B110 Wwt - Wastewater Treatment Permit #3 - Shell) (C1870170) **Project Management - Julie Romig** (Bld23-02886 Foundation) (Bld24-02034 Structural Steel) Permit Is To Construct The Shell, Metal Decks, Concrete Floors, Exiting Systems, Roof System. This Is Phase 1 & 2 For The Wwt Plant With A Phase 3 & 4 Expected. This Building Is Classified As Construction Type I-B. The Building Has A Total Floor Area Of About 662,223 Square Feet. The Footing And Foundation And Utilities Are Under...

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Boise

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Metal, Waste Processing and Treatment, Cement, Commercial, Steel, Power Generation (CCGT)

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project