Wastewater Treatment Facility Improvements REBID
Sector: Water Supply and Storage • Location: Williston, South Carolina, United States of America
Source: Dodge
Elko Street Well replacement of vertical turbine motor, well pump eval,variable frequency drive and control panel,chemical system upgrades,generator,building rehabilitation,conditioning electrical room,fascia and vented soffit carpentry,and appurt.State Street Well replacement of vertical turbine motor,well eval,water testing,variable frequency drive and control panel,conditioning well house,contr
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Road, Government, Wind, Manufacturing (Industrial), Cement
- Location
- Williston, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater Treatment Facility Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Elko Street Well replacement of vertical turbine motor, well pump eval,variable frequency drive and control panel,chemical system upgrades,generator,building rehabilitation,conditioning electrical room,fascia and vented soffit carpentry,and appurt.State Street Well replacement of vertical turbine motor,well eval,water testing,variable frequency drive and control panel,conditioning well house,control valves,meter,filtration system,canopy,concrete,piping,site grading,generator,and appurt. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Williston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Road, Government, Wind, Manufacturing (Industrial), Cement |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
