Wastewater Treatment Facility REBID
Sector: Water Supply and Storage • Location: Austin, Texas, United States of America
Source: Dodge USA
The construction of the Atlas Ranch MUD No. 1 Phase I Wastewater Treatment Facility (WWTF) to treat 126,000 gallons per day of domestic strength residential wastewater by means of an MBR System, utilizing treatment equipment supplied by Waterfleet. WWTF work includes, but is not limited to the following: Installation of one (1) 8-foot diameter lift station and valve vault complete with submersible
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Residential, Government, Cement, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Treatment Facility REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of the Atlas Ranch MUD No. 1 Phase I Wastewater Treatment Facility (WWTF) to treat 126,000 gallons per day of domestic strength residential wastewater by means of an MBR System, utilizing treatment equipment supplied by Waterfleet. WWTF work includes, but is not limited to the following: Installation of one (1) 8-foot diameter lift station and valve vault complete with submersible pumps, pipe, fittings, valves and other appurtenances; Installation of MBR System Concrete Pad a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Residential, Government, Cement, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
