Wastewater Treatment Lagoon and Collection System Improvements
Sector: Waste Processing and Treatment • Location: Canada
Source: Manitoba
The project is to alleviate pressures from hydraulic overloading, overland water will be redirected from combined sewer lines into new storm sewer lines in four locations throughout town. Manhole repair/replacement will be completed where the storm drains have broken away causing storm water to flow into the wastewater pipes feeding to the lagoon.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Government
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Manitoba
ConstructChat
Ask ConstructChat about Wastewater Treatment Lagoon and Collection System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is to alleviate pressures from hydraulic overloading, overland water will be redirected from combined sewer lines into new storm sewer lines in four locations throughout town. Manhole repair/replacement will be completed where the storm drains have broken away causing storm water to flow into the wastewater pipes feeding to the lagoon. |
Budget |
Location
Country | Canada |
Source
Source reliability | High |
Source | Manitoba |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Government |
Article published date | 2023-11-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
- St. Malo Water Renewal Project
