logo

Wastewater Treatment, Phase 5 - Plage du Foulon

Sector: Waste Processing and Treatment • Location: Quebec, Canada

Source: Infrastructure Canada

Project
Completed

The aim of this project is to control wastewater overflows in the Anse-au-Foulon area, along the St. Lawrence River, from the combined sewer systems north of Champlain Boulevard. It includes the construction of a 17,000 m3 retention reservoir, including a pumping station for wastewater discharge, the installation of an emergency overflow and more than 2,000 metres of sewer pipes. More specifically

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Commercial
Location
Quebec, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Wastewater Treatment, Phase 5 - Plage du Foulon

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Wastewater Treatment, Phase 5 - Plage du Foulon” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The aim of this project is to control wastewater overflows in the Anse-au-Foulon area, along the St. Lawrence River, from the combined sewer systems north of Champlain Boulevard. It includes the construction of a 17,000 m3 retention reservoir, including a pumping station for wastewater discharge, the installation of an emergency overflow and more than 2,000 metres of sewer pipes. More specifically, the work involves the installation of control valves with capacities ranging from 28 l/sec to 158 l/sec, and storm sewer pipes with diameters ranging from 300 mm to 525 mm over a length of around 73 m for the Ravin, Coulonge, Lemoine and Beaulieu sectors. Work will also be carried out to the east and west of the Anse-au-Foulon reservoir, including the installation of interceptor pipes ranging from 1,200 mm to 2,100 mm in diameter over a length of around 775 m, and pressure drainage pipes over a length of 1,600 m. The project also calls for the installation of a 900 mm-diameter magnetic flowmeter and a communication system to the flowmeter stations.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Quebec

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Commercial

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project