Wastewater Treatment Plant Bar Screen Replacement
Sector: Water Supply and Storage • Location: Port St. Joe, Florida, United States of America
Source: Dodge USA
Current bar screen is: Schreiber 48 Front loader Bar Screen. Channel Depth 4 8 . 480/120V AC. Replacement Bar Screen Must Meet the Following Criteria: Parkson Aqua Guard system Ability to handle 10 MGD flow rate Turnkey Project. All electrical, mechanical, controls, and supplies are to be included with this project. Screen should be able to remove heavy debris such as towels, jeans, rags, etc. Scr
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Seaport, Waste Processing and Treatment
- Location
- Port St. Joe, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Treatment Plant Bar Screen Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Current bar screen is: Schreiber 48 Front loader Bar Screen. Channel Depth 4 8 . 480/120V AC. Replacement Bar Screen Must Meet the Following Criteria: Parkson Aqua Guard system Ability to handle 10 MGD flow rate Turnkey Project. All electrical, mechanical, controls, and supplies are to be included with this project. Screen should be able to remove heavy debris such as towels, jeans, rags, etc. Screening should be able to screen out anything larger than 3/8 wide. All bolting hardware is to be ... |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port St. Joe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Seaport, Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
