logo
ProjectCompleted

Wastewater Treatment Plant Electrical Transformer Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Replace two existing main electrical transformers at the City’s wastewater treatment plant. Scope of work includes a detailed electrical needs assessment, pre-design, design, pre purchase of equipment (due to long lead times), design of the associated works inclusive of poles, overhead and underground cable, transfers, connections etc., purchase and installation of equipment. The assessment and pr

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Wastewater Treatment Plant Electrical Transformer Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Wastewater Treatment Plant Electrical Transformer Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace two existing main electrical transformers at the City’s wastewater treatment plant. Scope of work includes a detailed electrical needs assessment, pre-design, design, pre purchase of equipment (due to long lead times), design of the associated works inclusive of poles, overhead and underground cable, transfers, connections etc., purchase and installation of equipment. The assessment and pre-design work will confirm final electrical requirements, utility coordination with Brantford Power and costing. Both transformers are 1000kVA/27.6/4.16kV delta, primary metered units which provide all of the electrical service required to run the plant. These units are of undetermined age although field observations suggest that they are well over 20 years old. Routine maintenance and inspections indicate that both transformers have far exceeded their service lives and should be replaced to reduce the risk of complete failure, potential disruption to the operation of the plant and potential regulatory compliance issues. The existing transformers are also limiting required process improvements as they cannot handle any increased electrical load. The wastewater treatment plant is the only treatment facility in the City and services approximately 94,000 residents plus businesses. In the event that both transformers fail there is limited back-up capacity through diesel generators and could therefore either pose serious risk to the environment (Grand River receiving body) and potentially homes in the southern most part of the City.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project