Wastewater Treatment Plant Improvements Phase 2
Sector: Water Supply and Storage • Location: Sioux City, Iowa, United States of America
Source: Dodge USA
Once phase one of the project is completed, phase two will begin. Tom Pingel, the city's utility director in charge of the wastewater treatment plant, previously told The Journal the second phase is estimated to run between $175 and $200 million.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Power Generation (CCGT)
- Location
- Sioux City, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wastewater Treatment Plant Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Once phase one of the project is completed, phase two will begin. Tom Pingel, the city's utility director in charge of the wastewater treatment plant, previously told The Journal the second phase is estimated to run between $175 and $200 million. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Sioux City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
