Wastewater Treatment Plant Improvements
Sector: Cement • Location: Alpine, Texas, United States of America
Source: Dodge USA
The project consists of the rehabilitation of Clarifier #1 and six (6) existing sludge drying beds. The replacement of mechanical and electrical equipment and concrete repairs are included for Clarifier #1. Replacing media, underdrain piping, and liner, and concrete ramp, runners, and walls repairs are included in the scope for the sludge drying beds.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the rehabilitation of Clarifier #1 and six (6) existing sludge drying beds. The replacement of mechanical and electrical equipment and concrete repairs are included for Clarifier #1. Replacing media, underdrain piping, and liner, and concrete ramp, runners, and walls repairs are included in the scope for the sludge drying beds. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
