Wastewater Treatment Plant New 30,000 GPD package
Sector: Water Supply and Storage • Location: Wichita Falls, Texas, United States of America
Source: Dodge
The project will replace the existing 30,000 GPD package wastewater treatment plant. A foundation will be set and a new package wastewater treatment plant of at least 30,000 GPD will be installed. Package plant should have mechanical functions installed as part of the package (rakes, clarifier, etc.). A mechanical bar screen will be part of the plant installed at head of plant. Field piping and el
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Wichita Falls, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wastewater Treatment Plant New 30,000 GPD package
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace the existing 30,000 GPD package wastewater treatment plant. A foundation will be set and a new package wastewater treatment plant of at least 30,000 GPD will be installed. Package plant should have mechanical functions installed as part of the package (rakes, clarifier, etc.). A mechanical bar screen will be part of the plant installed at head of plant. Field piping and electricity will be routed to the new plant. Additional appurtenances installed as necessary. Old p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wichita Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
