Wastewater Treatment Plant Upgrades Phase 1 - Replacement of Rotating Biological Contactors
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project will replace key components for three Rotating Biological Contactors (RBCs), which remove pollutants from untreated wastewater, for the Wikwemikong First Nation wastewater treatment facility in Wikwemikong, Ontario. The work will remove and demolish the existing RBCs, make the necessary repairs and modifications to the housing structure in order to house the new units, and install new
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Wastewater Treatment Plant Upgrades Phase 1 - Replacement of Rotating Biological Contactors
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace key components for three Rotating Biological Contactors (RBCs), which remove pollutants from untreated wastewater, for the Wikwemikong First Nation wastewater treatment facility in Wikwemikong, Ontario. The work will remove and demolish the existing RBCs, make the necessary repairs and modifications to the housing structure in order to house the new units, and install new units in their place. The project will help reduce future operation and maintenance costs, allow the wastewater facility to meet the current community demand, and support improvements to the health and safety of Wikwemikong First Nation. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
