Wastewater Treatment Plants (WWTPs) in Bommanahalli
Sector: Solar • Location: Bangalore, Karnataka, India
Source: Equitypandit
Design, engineering, construction and commissioning of Wastewater Treatment Plants with tertiary treatment facility, biogas generation, solar sludge drying beds and intermediate pumping stations along with associated piping works. The project is scheduled to be completed over 30 months, followed by 10 years of operation and maintenance.
- Status
- Closed
- Sector
- Solar, Water Supply and Storage, Biomass, Government
- Location
- Bangalore, Karnataka, India
- Updated
- 22 Jul 2026
- Source
- Equitypandit
ConstructChat
Ask ConstructChat about Wastewater Treatment Plants (WWTPs) in Bommanahalli
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design, engineering, construction and commissioning of Wastewater Treatment Plants with tertiary treatment facility, biogas generation, solar sludge drying beds and intermediate pumping stations along with associated piping works. The project is scheduled to be completed over 30 months, followed by 10 years of operation and maintenance. |
Original sector | Water and Wastewater |
Budget |
Location
Country | India |
State | Karnataka |
City | Bangalore |
Source
Source | Equitypandit |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Biomass, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
